NIO EC7 100kWh Price in Nigeria Starting from NGN 101,574,000 to NGN 106,920,000 .NIO EC7 100kWh Comes with AWD 480 kW (653 hp) Motor Power that Produce 210 km/h (130 mph) max speed and Acceleration of 3.8 sec 0-100 km/h. It has 100 kWh Liquid-cooled Li-ion 400V battery. It available in both AC or DC charging option.
NIO EC7 100kWh Price in Nigeria & Specifications
Price in Nigeria: NGN 104,247,000
NIO EC7 100kWh Full Specifications
BASIC INFO | |
Brand | NIO |
Model | EC7 100kWh |
Status | Coming soon |
Year | 2023 |
BATTERY | |
Capacity | 100 kWh total |
Range | 635 km CLTC |
Recuperation | Yes |
PERFORMANCE | |
Power | AWD 480 kW (653 hp) |
Torque | 850 Nm (627 lb-ft) |
Acceleration | 3.8 sec 0-100 km/h |
BODY | |
Type | SUV |
Doors | 5 |
Seats | 5 |
Dimensions | 4968 x 1974 x 1714 mm (195.6 x 77.7 x 67.5 in) |
Wheelbase | 2960 mm (116.5 in) |
Towing | No |
Wheels Size | R20, R21, R22 |
SUSPENSION | |
Rear | Multi-link smart air |
Front | Double wishbone |
CHARGER | |
AC Charging | Type 2 |
DC Charger | CCS V2X - includes V2I, V2N, V2V, V2P, V2D standards |
DC Charger | CCS V2X - includes V2I, V2N, V2V, V2P, V2D standards |
DC Charger | CCSV2X - includes V2I, V2N, V2V, V2P, V2D standards |
DC Charger | CCS <>V2X - includes V2I, V2N, V2V, V2P, V2D standards |
DC Charger | V2X - includes V2I, V2N, V2V, V2P, V2D standards |
DC Charger | CCS V2X - includes V2I, V2N, V2V, V2P, V2D standards |
DC Charger | CCS |
DC Charger | CCS V2X - includes V2I, V2N, V2V, V2P, V2D standards |
COMFORT | |
Seats | Adjustable, heated and ventilated front and rear seats; massage |
Roof | Panoramic glass roof, fixed |
Camera | 360 and reversing |
Parking Aids | Front and rear sensors, Automatic Parking Assist |
Connectivity | 3-zone climatronic |
SAFETY | |
Airbags | 7 airbags: front, side, rear, head airbag system |
Driving Aids | 1 LIDAR, 5 mmWave radars, 7 8MP cameras, 4 3MP surround view cameras, 12 sensors. High Beam Control, Forward Collision Warning, Automatic Emergency Braking, Traffic Sign Recognition, Lane Change Warning, Lane Departure Warning, Blind Spot Alert, Rear Cros |
Last Updated: 14 Feb, 2024
NIO EC7 100kWh Comparisions
NIO EC7 100kWh
NIO EC7 100kWh Price in Other Countries
NIO EC7 100kWh Price In Netherlands
NIO EC7 100kWh Price In Bulgaria
NIO EC7 100kWh Price In South Korea
NIO EC7 100kWh Price In Brazil
NIO EC7 100kWh Price In Cyprus
NIO EC7 100kWh Price In Chile
NIO EC7 100kWh Price In Norway
NIO EC7 100kWh Price In Trinidad
NIO EC7 100kWh Price In Czechia
NIO EC7 100kWh Price In Zimbabwe
NIO EC7 100kWh Price In Costa Rica
NIO EC7 100kWh Price In Romania
User Opinions